Construction & Installation

Overview
Show Description
Show Less

The construction and installation phase of offshore wind projects involves a series of steps that begin from the onshore site and extend to the offshore location. This phase encompasses transportation logistics, cable boring, substation development, and various office-based support roles. Here is a detailed summary of the process:

  1. Onshore Preparations:
    Site Preparation: Onshore activities involve preparing the site where the project's operations and maintenance base will be located. This includes establishing facilities for equipment storage, offices, workshops, and accommodation for personnel.
    Infrastructure Development: Necessary infrastructure such as roads, access points, and crane pads are constructed to facilitate the transportation of equipment and materials to the project site.
  1. Transportation Logistics:
    Material and Equipment Transport: Various components, including wind turbine parts, foundations, and subsea cables, are transported from manufacturing sites to the project location. This involves coordinating the logistics of heavy-lift vessels, barges, and other specialized transportation methods to deliver the components to the offshore site.
  1. Cable Boring and Installation:
    Cable Boring: The subsea cable route is surveyed, and cable boring techniques, such as horizontal directional drilling, may be employed to create channels for the cables under the seabed, ensuring their secure placement.
    Subsea Cable Installation: Specialized vessels and equipment are used to install the subsea cables along the designated route. These cables connect the wind turbines to the onshore or offshore substations, enabling the transmission of generated electricity.
  1. Substation Development:
    Offshore Substation Installation: Offshore substations are constructed and installed, serving as hubs for collecting and transforming the electricity generated by the wind turbines. These substations typically include transformers, switchgear, and control systems.
    Onshore Substation Connection: Subsea cables from the offshore substations are connected to the onshore substation, where the electricity is further transformed and integrated into the grid for distribution.
  1. Office-Based Support Roles:
    Project Management: Office-based project managers oversee the overall construction and installation process. They coordinate with various stakeholders, manage budgets, monitor timelines, and ensure compliance with regulations.
    Engineering and Design: Engineers and designers work on technical aspects such as structural engineering, electrical systems, and cable routing. They provide expertise and support throughout the construction and installation phase.
    Health, Safety, and Environmental (HSE) Compliance: HSE professionals ensure that safety protocols are implemented, conduct risk assessments, and oversee environmental compliance throughout the construction process.
    Logistics and Supply Chain: Office-based logistics coordinators manage the movement of equipment, materials, and personnel, coordinating transportation logistics and supply chain operations.
    Administration and Documentation: Administrative staff handle documentation, contracts, permits, and general administrative tasks to ensure smooth project operations.